Fullerton College
CHALLENGE: GST successfully navigated these challenges, ensuring a seamless installation and integration process that met the project’s objectives.
CHALLENGE: GST successfully navigated these challenges, ensuring a seamless installation and integration process that met the project’s objectives.
CHALLENGE: to replace outdated kiosks at CSUF with advanced digital signage that could withstand harsh weather, seamlessly integrate into the campus, and empower staff with an easy-to-manage, high-performance communication system.
CHALLENGE: El Camino College boosts campus communication with a durable, high-performance outdoor display, keeping students and visitors informed with clear and reliable updates.
CHALLENGE: CSU Fullerton's 200-inch ViewSonic video wall installation required precise planning, seamless Extron integration, and timely completion despite cable delivery delays.
CHALLENGE: The initial discussions with the customer began with our AV engineers. Due to the scope of work, the GST Team worked with the customer, weeks prior to the proof of concept, to determine the plan ...
CHALLENGE: As a long-standing customer, LACCD was required to relinquish space in one of their conference rooms. Therefore, needed labor assistance to remove, transfer, and reinstall two Lifesize ...
CHALLENGE: A California public community college located in Santa Barbara county wanted a complete functioning AV system for their public safety complex.
CHALLENGE: A growing local university started to include more online and international students, and a vast AV systems upgrade was desired. The virtual collaboration was becoming essential to the student-teacher ...
CHALLENGE: A local community college district was in vast need of improving their existing outdated conference room. The district not only needed to swap out longstanding equipment, but also wanted ...