GALLERY

The outdoor display kiosk that stood prior to the installation of the new, upgraded digital signage kiosk at CSU Fullerton.
On-site pre-assembly of the kiosk structure, preparing for the installation of dual-sided displays.
Fully installed digital signage kiosk at CSU Fullerton, ready for operation and student engagement.

PROJECT SUMMARY

Golden Star Technology (GST) partnered with California State University, Fullerton (CSUF) to transition from traditional, non-digital kiosks to advanced outdoor digital signage kiosks. GST designed and installed four dual-sided, 55″ digital signage kiosks at the Joseph Clayes III Performing Arts Center. These state-of-the-art kiosks are designed to withstand extreme weather conditions and provide dynamic, high-resolution content to students, staff, and visitors.

Key Tasks Included: 

  • Install kiosks that can withstand harsh outdoor conditions, ensuring longevity and minimal maintenance.
  • Ensure the new kiosks are integrated into existing campus infrastructure with minimal disruption.
  • Equip campus IT staff with the necessary knowledge to manage and maintain the new digital signage system

GST’s expertise in AV solutions enabled CSUF to achieve its objective of modernizing campus communication with durable, high-performance digital signage. The project’s success demonstrates GST’s commitment to delivering quality solutions that meet the unique needs of educational institutions, ensuring long-term client satisfaction.

QUICK FACTS

ORGANIZATION SIZE:

Leading Public University

Over 40,000 students, 2,000 faculty members, and numerous facilities across campus.

INDUSTRY: 

Higher Education

VENDORS INVOLVED:

BrightSign, Peerless – AV, Covid-Audio Visual

CHALLENGE

Golden Star Technology (GST) was to seamlessly transition California State University, Fullerton (CSUF) from outdated, non-digital kiosks to cutting-edge, dual-sided digital signage kiosks that could withstand harsh outdoor conditions, integrate smoothly into existing campus infrastructure, and empower IT staff to manage the new system—all while minimizing disruptions and ensuring high-quality, reliable performance.