GALLERY

Installation of the video wall panels begins, with all panels aligned and secured to ensure a precise fit before adding the final components.
The completed video wall structure, fully assembled and ready for testing, with all panels in place and aligned.
The video wall comes to life with a vibrant display, showcasing its full capabilities after successful installation and calibration.

PROJECT SUMMARY

Golden Star Technology (GST) was contracted by CSU Fullerton, a major client in the education sector, to enhance the audiovisual capabilities of the Song Library PLN-216 DVC Room. The project involved installing the first 200-inch ViewSonic Video Wall in the U.S., designed to support complex presentations and multimedia content. GST seamlessly integrated the new video wall with the existing AV infrastructure, ensuring optimized performance and uninterrupted operation, setting a new standard for AV installations in educational settings.

Key Tasks Included: 

  • Clear installation area and ensure electrical and structural readiness.
  • Install the ViewSonic Video Wall, panels, AV equipment, and hard wire outlets.
  • Integrate 4K components into the existing AV system for seamless operation.
  • Program and configure the Extron control system for optimized performance.
  • Test and calibrate all systems to ensure proper functionality.
  • Provide training for end-users and deliver detailed documentation.

The project successfully introduced advanced AV technology with the first-ever 200-inch ViewSonic Video Wall. The 4K upgrades and optimized control programming ensure seamless operation and enhanced performance. Testing confirmed all systems meet specifications, and end-user training was completed. Overall, the project exceeded expectations, setting a new benchmark for AV technology in education.

QUICK FACTS

ORGANIZATION SIZE:

Leading Public University

Over 40,000 students, 2,000 faculty members and numerous facilities across campus.

INDUSTRY: 

Higher Education

VENDORS INVOLVED:

ViewSonic, Extron

CHALLENGE

The installation of the 200-inch ViewSonic video wall at CSU Fullerton required precise planning, as it was the first of its kind in the U.S. Structural alignment was critical to ensure a perfect fit, and delays in custom cable delivery forced panel reinstallation to run a 25ft HDMI cable. Seamless integration with the existing Extron system was essential, and the project had to be completed on time to meet the academic schedule.