GALLERY

Wall-mounted touch panel installed for easy control of the AV system at Miraleste Library, offering streamlined access to audio and video settings.
Newly installed projection system at Miraleste Library, featuring a ceiling-mounted 10,000-lumen projector and motorized screen for clear presentations.
AV equipment rack with Extron, Shure, and Cisco components, enabling seamless control and integration of the AV systems at the Miraleste Library.

PROJECT SUMMARY

Palos Verdes Library District consulted with GST to design, install, and configure a modern audio-visual system for the Miraleste Library. The Project aimed to enhance the library’s technological capabilities for presentations community events and meetings through an integrated AV Solution.

Key Tasks Included: 

  • Installed a ceiling-mounted 10,000-lumen projector with WUXGA resolution and a 164″ motorized screen.
  • Configured an AV switch for multiple input sources, including HDMI.
  • Integrated six ceiling speakers and a wireless microphone system for clear audio.
  • Set up two Extron touch panels for easy control of audio and inputs.
  • Provided a one-hour staff training for system operation

The successful installation of the A/V system at Miraleste Library has transformed the facility into a versatile space capable of hosting a variety of events with ease. The system’s intuitive design and comprehensive support ensure that staff can operate the system with minimal technical expertise, enhancing the library’s value to the community.

QUICK FACTS

ORGANIZATION SIZE:

Independent District

Operates three branches

Serves 69,843 residents

INDUSTRY: 

Public Libraries

VENDORS INVOLVED:

Epson, Da-Lite, Extron, Shure, Chief, RDL, Cisco, Middle Atlantic

CHALLENGE

To design and implement a state-of-the-art A/V system for the Miraleste Library that seamlessly integrates cutting-edge technology, enhances user experience, and delivers high-quality performance. The system needed to meet the demands of diverse use cases while ensuring compatibility with existing infrastructure, all within a limited installation timeframe and a public facility setting.